Browsing by Author "Parrock, Philip"
Now showing 1 - 1 of 1
Results Per Page
Sort Options
- ItemMega project analysis : a case study of the Gauteng Freeway Improvement Project(Stellenbosch : Stellenbosch University, 2015-04) Parrock, Philip; Van der Westhuizen, Janis; Stellenbosch University. Faculty of Arts and Social Sciences. Dept. of Political Science.ENGLISH ABSTRACT: Mega projects have fascinated human beings for as long as history can remember. The urge to build something bigger and better than has ever been done before has always been a driving force behind the human race’s relentless pursuit of technological advancement. It is in this vein that mega projects have evolved over time, as methods of construction improved, so did the scale on which people could attempt new projects. The Channel Tunnel between England and France, the Hoover Dam in America and the Millau Viaduct in the French countryside are some of the biggest examples of infrastructure projects in the world and these are all unequivocally, mega projects. Costing at least $ 250 million and incorporating major technological challenges, mega projects continue to inspire and motivate artists and engineers alike. This thesis seeks to expand people’s understanding of the analysis of these mega projects. Mega project analysis is a field that has struggled to differentiate itself ordinary project analysis. The Gauteng Freeway Improvement Project (GFIP) and the associated e-tolling mega project will be analysed in this thesis. The framework for analysis will be provided by the work of Flyvbjerg, Bruzelius and Rothengatter (2003), who seek to analyse mega project success or failure based on three key indicators of economic sustainability, environmental concerns and the effect of public support. This thesis will use the indicators of economic sustainability and the effect of public support to determine whether the Gauteng Freeway Improvement Project (GFIP) can be viewed as a failed mega project or not. After an in-depth study of the data and material available, this descriptive and explanatory study shows that the GFIP and associated e-tolling mega project is indeed a failed mega project. This is because it has failed the analysis in both categories of economic sustainability and the effect of public support.