Real-time scheduling in a sensorised factory using cloud-based simulation with mobile device access

dc.contributor.authorSnyman, Stephanen_ZA
dc.contributor.authorBekker, Jamesen_ZA
dc.date.accessioned2017-12-20T12:06:09Z
dc.date.available2017-12-20T12:06:09Z
dc.date.issued2017
dc.descriptionCITATION: Snyman, S. & Bekker, J. 2017. Real-time scheduling in a sensorised factory using cloud-based simulation with mobile device access. South African Journal of Industrial Engineering, 28(4):61-169, doi:10.7166/28-4-1860.
dc.descriptionThe original publication is available at http://sajie.journals.ac.za
dc.description.abstractENGLISH ABSTRACT: Scheduling is a challenge that persists in the operational phase of the manufacturing life-cycle. The challenge can be attributed to the complex, dynamic, and stochastic nature of a manufacturing system. Computer simulation is often used to assist with scheduling, as it can sufficiently mimic complex, discrete, dynamic, stochastic processes. We propose an architecture of a real-time simulation scheduling system that incorporates the use of a sensorised-network of a job-shop, mobile devices, and cloud computing with simulation and scheduling methods. A simulation model is also created to describe the environment and operations of a job-shop.en_ZA
dc.description.abstractAFRIKAANSE OPSOMMING: Skedulering is ’n uitdaging wat in die operasionele fase van die vervaardigingslewensiklus voortduur. Hierdie uitdaging kan toegeskryf word aan die komplekse, dinamiese, en stogastiese aard van ’n vervaardigingstelsel. Simulasie word dikwels gebruik om te help met die skeduleringsproses, aangesien dit komplekse, diskrete, dinamiese, stogastiese prosesse voldoende kan naboots. Ons stel ’n argitektuur van ’n reële tyd simulasie skeduleringstelsel voor, wat gebruik maak van ’n sensornetwerk in ’n werkswinkel, mobiele toestelle, sowel as simulasie- en skeduleringsmetodes in die elektroniese wolk. ’n Simulasiemodel is ook geskep om die omgewing en aktiwiteite van ’n werkswinkel te beskryf.af_ZA
dc.description.urihttp://sajie.journals.ac.za/pub/article/view/1860
dc.description.versionPublisher's version
dc.format.extent9 pagesen_ZA
dc.identifier.citationSnyman, S. & Bekker, J. 2017. Real-time scheduling in a sensorised factory using cloud-based simulation with mobile device access. South African Journal of Industrial Engineering, 28(4):61-169, doi:10.7166/28-4-1860
dc.identifier.issn2224-7890 (online)
dc.identifier.issn1012-277X (print)
dc.identifier.otherdoi:10.7166/28-4-1860
dc.identifier.urihttp://hdl.handle.net/10019.1/103023
dc.language.isoen_ZAen_ZA
dc.publisherSouthern African Institute for Industrial Engineering
dc.rights.holderAuthors retain copyright
dc.subjectManufacturing life-cycleen_ZA
dc.subjectManufacturing engineeringen_ZA
dc.subjectProduction schedulingen_ZA
dc.subjectComputer schedulingen_ZA
dc.titleReal-time scheduling in a sensorised factory using cloud-based simulation with mobile device accessen_ZA
dc.typeArticleen_ZA
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
snyman_real_2017.pdf
Size:
633.83 KB
Format:
Adobe Portable Document Format
Description:
Download article
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.95 KB
Format:
Item-specific license agreed upon to submission
Description: