Bridging the gap between strategic control and performance measurement : a systems approach
dc.contributor.advisor | Schutte, C. S. L. | |
dc.contributor.advisor | Von Leipzig, Konrad | |
dc.contributor.author | Pienaar, Willem Alexander | en_ZA |
dc.contributor.other | Stellenbosch University. Faculty of Engineering. Dept. of Industrial Engineering. | |
dc.date.accessioned | 2010-11-30T11:58:55Z | en_ZA |
dc.date.accessioned | 2010-12-15T10:50:32Z | |
dc.date.available | 2013-12-31T22:10:05Z | |
dc.date.issued | 2010-12 | en_ZA |
dc.description | Thesis (MSc (Industrial Engineering))--Stellenbosch University, 2010. | |
dc.description.abstract | Please refer to full text to view abstract. | |
dc.embargo.terms | 2013-12-31 | |
dc.identifier.uri | http://hdl.handle.net/10019.1/5465 | |
dc.language.iso | en_ZA | |
dc.publisher | Stellenbosch : Stellenbosch University | |
dc.rights.holder | Stellenbosch University | |
dc.subject | Strategic management | en_ZA |
dc.subject | Performance -- Measurement | en_ZA |
dc.subject | Systems approach | en_ZA |
dc.title | Bridging the gap between strategic control and performance measurement : a systems approach | en_ZA |
dc.type | Thesis |
Files
Original bundle
1 - 3 of 3
Loading...
- Name:
- memo_style.pdf
- Size:
- 34.51 KB
- Format:
- Adobe Portable Document Format
- Description:
Loading...
- Name:
- pienaar_bridging_2010.pdf
- Size:
- 38.38 MB
- Format:
- Adobe Portable Document Format
- Description:
Loading...
- Name:
- pienaar_bridging_2010.pdf
- Size:
- 45.23 MB
- Format:
- Adobe Portable Document Format
- Description: